NASA GSFC – OFFICE REMODEL

NASA GSFC – OFFICE REMODEL
Year:
2022
Location:
Greenbelt, MD
Category:
Government

This project involved reinforcing the floor structure of a cleanroom at NASA’s Goddard Space Flight Center. The work began with documenting existing conditions and analyzing structural load capacities. Engineered solutions were designed to strengthen the concrete pad, ensuring enhanced stability and compliance with operational demands. The project included cost and schedule assessments, a detailed final report with design recommendations, and construction oversight to maintain adherence to design specifications. The result was a reinforced and reliable structural solution tailored to the cleanroom’s needs.

Previous
OFFICE FITOUT
Next
INTERIOR RENOVATION – NEW HOME OFFICE